摘要 南非瓦尔河取水项目低位泵房竖井施工是该项目中重要的组成部分,其位置紧临VAAL河边,低位泵房土建工程施工主要包括竖井开挖和墙体施工,竖井开挖施工主要是根据地质情况,松散土采用正常开挖,岩石部分以下采用爆破后开挖的方法并随时在开挖过程中岩体喷锚支护,墙体施工主要介绍了墙体混凝土浇筑方法、质量控制,以及在施工过程中遇到的强渗水处理。 Construction of the low lift pump station(LLPS) is the important section for the project.Civil works for LLPS mainly consist of the shaft excavation and walls of the LLPS.The shaft excavation is according the geologically condition,and the loose materials are remoued firstly,then blasting for the rock and rock support is done during the excavation.Wall construction mainly consists of the concrete pouring,quality control and dealing with the strong water seepage from the dam during construction.
作者 程光金
出处 《施工技术》 CAS 北大核心 2010年第S2期26-29,共4页 Construction Technology
关键词 竖井开挖 喷锚支护 强渗水 质量控制 shaft excavation rock support seepage quality control
  • 相关文献

参考文献5

二级参考文献13

  • 1周汉荣.土力学地基与基础[M].武汉:武汉工业大学出版社,1994..
  • 2冶金工业部建筑研究总院.GB50086-2001锚杆喷射混凝土支护技术规范[S].北京:中国计划出版社,2001.
  • 3中国建筑科学研究院.JGJ120-99建筑基坑支护技术规程[S].北京:中国建筑工业出版社,1999.
  • 4JTGD70-2004.公路隧道设计规范[S].[S].,..
  • 5中国建筑科学研究院.GB50007-2002建筑地基基础设计规范[S].北京:中国建筑工业出版社,2002.
  • 6GB土工实验标准办法(19—23页)
  • 7曹传林,廖朝华,郭小红,等.分岔隧道现场监测与分析研究[A].2005年山区高速公路建设技术交流会论文集[C].北京:人民交通出版社,2005.
  • 8中交第二公路勘察设计研究院.厦门东通道海底隧道施工图设计文件[R].[s.l.]:[s.n.],2005.
  • 9郭小红.大跨度山岭隧道结构设计方法——结构承载能力法[J].公路,2000,45(5):40-45. 被引量:2
  • 10郭小红,乔春江.对隧道支护结构承载能力的分析[J].现代隧道技术,2002,39(2):33-37. 被引量:4