提出几种比较典型土层中挤土桩施工中的常见问题,包括老黏土中打桩、饱和黏土中打桩、饱和松散砂性土中打桩等,并给出相应的解决措施。
The common problems for compaction piles during construction in several typical soil layers are put forward,including pile driving in aged clay,saturated clay and saturated loose sandy soil.And corresponding solving measures are indicated.