摘要
梁柱节点受力状态较为复杂,是高层建筑框架中特殊的部位,在实际施工中,常常会遇到相关的问题。结合施工实际,提出了梁柱节点混凝土施工的技术措施。
It is complex for beam-column joint's loading.The joint is the special part in high-rise building.During the building construction,some related problems often occur.In this article,some technical measures are put forward on beamcolumn joint concrete construction combined the practice engineering.
出处
《施工技术》
CAS
北大核心
2010年第S2期179-181,共3页
Construction Technology
关键词
建筑工程
施工管理
梁柱节点
技术措施
building engineering
construction management
beam-column joint
technical measure