摘要
总结双连拱隧道施工的3种方法,介绍每种施工方法的施工流程和优缺点,提出双连拱隧道施工中防排水问题的处理。最后指出了施工中常见的一些问题,并给出了合理的解决建议。
the author summarizes three methods in double-arch tunnel construction,and introduces the process,advantages and disadvantages of each construction method.Then he proposes the treating methods for waterproof and drainage in double-arch tunnel construction.Finally,he points out some common problems in the construction,and gives some reasonable suggestion to solve these problems.
出处
《施工技术》
CAS
北大核心
2010年第S2期274-277,共4页
Construction Technology
关键词
双连拱隧道
施工方法
中墙
double-arch tunnel
construction method
middle wall