摘要
以华光潭梯级水电站和周公源梯级水电站的竣工验收调查为例,论述了水利水电工程环保"三同时"竣工验收调查的主要内容和重点,提出了目前调查工作存在的一些问题,并对今后水利水电工程的竣工验收调查提出了建议。
Huaguangtan cascade hydropower stations and Zougongyan cascade hydropower station as an example,discussed the investigation content and focus of Water Conservancy and Hydropower Engineering environmental'3 at the same time' completion and acceptance,and presend problems in the current investigations,also put forward recomnendations for future work.
出处
《环境科学与技术》
CAS
CSCD
北大核心
2010年第S1期483-487,共5页
Environmental Science & Technology
关键词
竣工验收
水利水电
生态影响调查
Completion and acceptance
Water Conservancy and Hydropower
Ecological impact survey