期刊文献+

铁路客站候车大厅空调机房设置方式探讨 被引量:1

下载PDF
导出
摘要 通过对现有典型车站候车大厅空调系统机房设置方式的分析,提出机房、风柱一体化送风单元的概念。从占用面积、节能、初投资、运行费用等几方面给出其与现有空调系统机房设置形式的对比,并尝试论述与建筑合理结合的方式及适用范围,得出机房、风柱一体化单元的可行性、合理性。
出处 《铁道标准设计》 北大核心 2010年第S2期8-11,共4页 Railway Standard Design
  • 相关文献

参考文献4

二级参考文献8

  • 1R.M.Lazzarin.A new HVAC system based on cogeneration by an I.C.engine[].Applied Thermal Engineering.1996
  • 2Y.Zhang.The environmental advantage of gas-fired cogeneration sys-tem[].Shandong Power technology.2000
  • 3Sun Z C,,Wang R Z,Sun W Z.Energetic efficiency of a gas engine - driven cooling and heating system[].Applied Thermal Engineering.2004
  • 4V. Havelsky.Energetic efficiency of cogeneration systems for combined heat, cold and power production[].International Journal of Refrigeration.1999
  • 5Kong XQ,Wang RZ,Huang XH.Energy efficiency and economicfeasibility of CCHP driven by stirling engine[].Energy Conversionand Management.2004
  • 6Adwin Martens.The energetic feasibility of CHP compared to the separate production of heat and power[].Applied Thermal Engineering.1998
  • 7Dr.Andy Tindale.DesignBuilder and EnergyPlus[].The BuildingEnergy Simulation User News.2004
  • 8.Building Thermal Envelopeand Fabric Load Tests—DesignBuilder Version 1.2.0(incorporatingEnergyPlus version1.3.0)[].ANSI/ASHRAE Standard —.2006

共引文献6

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部