摘要
邯钢新区炼铁厂二期360m2烧结机因尾部星轮两侧齿板不同步,引起烧结机跑偏,影响了正常生产。为解决此问题,该厂通过将机尾星轮各齿板所有孔沿周向旋转并扩孔加工改变相位后,烧结机调偏取得显著效果,达到了烧结机正常运行的要求。
Because of star wheel not synchronous of HANGANG 360m2 sintering machine,it caused pallets running track deflection,and thereby influenced sintering production.In order to solve this problem,In this paper,by rotating and enlarging all holes of the star wheel along the circle,adjusting the phase.Making the remarkable effect,the problem of pallets running track deflection was corrected.
出处
《冶金设备》
2010年第S1期69-70,133,共3页
Metallurgical Equipment
关键词
烧结机
跑偏
星轮齿板
相位调整
Sintering machine Pallets running track deflection Star wheel Adjust phase