3LEE S W,STOFFELS S M.Effects of Excessive Pavement Joint Opening and Freezing on Sealants[J].Journal of Transportation Engineering,2003,129(4):444-450.
4HOERNER T E,TARR S M,DARTER M I.Guide to developing performance-related specifications for PCC pavement[R],FHWARD-98-171.1998.
5EVANS L D,SMITH K L,ROMINE A R.Materials and Procedures for Repair of Joint Seals in Portland Cement Concrete Pavements-Manual of Practice[R],FHWA-RD-99-146,1999.
6IOANNIDES A M,LONG A R,MINKARAH I A.Joint Sealant and Structural Performance at the Ohio Route 50 Test Pavement[C]//TRB 2004 Annual Meeting.2004.