期刊文献+

北京地下直径线运营对地铁2号线隧道结构振动影响控制标准的研究 被引量:16

Study on Standard for Assessing Effects on Structures of Metro Line 2 Due to Vibrations Induced by Underground Trains on Diameter Line in Beijing
下载PDF
导出
摘要 为了评估从北京西站到北京站地下直径线建成运营后列车振动对北京地铁2号线隧道结构产生的影响,结合工程实际,从理论上分析了在列车运行引起的随机振动作用下,地下隧道钢筋混凝土结构产生疲劳破坏的机理,综合考虑了地下环境对地铁隧道结构产生的影响,并参照国内外相关控制标准,得到在地下直径线正常运营情况下,北京地铁2号线隧道结构安全及正常使用的振动控制标准。 In order to assess the effects on the tunnel structures of metro line 2 due to the vibrations induced by the underground trains on the Diameter line which connects two of the biggest railway station in Beijing, a standard of vibration assessment is presented in this paper. The standard is based on the theory of the fatigue damage in the concrete structure due to the application of vibrations. Moreover, the influence of the underground environment on the tunnel structures is also considered, and some standards of vibration assessment in China and other countries are referred in this standard.
出处 《隧道建设》 2007年第S2期93-97,共5页 Tunnel Construction
关键词 隧道结构 振动 控制标准 疲劳损伤 tunnel vibration standard fatigue damage
  • 相关文献

参考文献1

共引文献124

同被引文献87

引证文献16

二级引证文献97

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部