期刊文献+

苏州火车站改造工程盖挖逆作法施工技术 被引量:1

On the construction technique of the cover and excavation top-down method in the reconstruction project for Suzhou railway station
下载PDF
导出
摘要 介绍了苏州火车站改造工程在低渗透性、饱和、软流塑的软弱地层中采用盖挖逆作法修筑地铁车站的施工技术,指出在地铁车站施工中,盖挖逆作法对工程环境影响较小,工期短,综合技术经济指标较为理想,可推广应用。 The paper introduces the construction technique, the cover and excavation top-down method, which is adopted in the construction project of the subway station in the weak strata featured with low permeability, saturated and soft flowage plastic in the reconstruction project for Suzhou railway station, and Imints out in the construction of the subway station, the cover and excavation top-down method, which has little influence on the construction environment, has shorter construction period and ideal comprehensive technical and economic index, so it can be further extended.
作者 黄明玉
出处 《山西建筑》 2009年第12期157-158,共2页 Shanxi Architecture
关键词 地铁 盖挖逆作 施工 技术 subway, cover and excavation top-down, construction, technique
  • 相关文献

参考文献4

二级参考文献5

  • 1孙鸿雁.城市浅埋水工隧洞暗挖法施工技术[J].山西建筑,2007,33(1):355-356. 被引量:1
  • 2刘建航,基坑工程手册,1997年
  • 3赵锡宏,高层建筑深基坑围护工程实践与分析,1996年
  • 4Ou C Y,Can Geotech J,1993年,30卷,758页
  • 5中铁二局集团.铁路工程施工技术手册隧道篇[M].北京:中国铁道出版社,2004,11-12.

共引文献272

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部