摘要
介绍孟加拉迈格拉哈特电厂吹填工程复杂的国际环境和艰难的地基处理设计历程。从中可以看出 ,只要掌握了基本的土力学原理和国际通用标准规范 ,中国公司完全可以在国际市场上与外国的跨国公司成功抗衡。
This paper introduces the complicated external environment and difficult design course of ground treatment on a hydraulic fill project in Bangladesh. It is indicated that Chinese company can fully compete with the multinational company for the civil engineering as long as the fundamental principle of soil mechanics and international codes are mastered.