摘要
本文首次提出了利用数学模型估算河道推移质输沙量,建立了一个恒定非平衡推移质泥沙数学模型,并利用水槽试验成果对之进行了验证.通过实例研究证明,用本文提出的方法估算河道推移质输沙量是可行的.
In this paper a new method is proposed that the quantity of the bedload transport is estimated by using the methematical model of sediment transport. A numerical model for nonequilibrium bedload transport by steady flows is estalished. A set of experimental data in flume is used to calibrate the model and a practical example is investigated in order to verify the feasibility of the new method.
出处
《水利学报》
EI
CSCD
北大核心
1998年第S1期99-102,共4页
Journal of Hydraulic Engineering
关键词
推移质输沙量
数学模型
反问题
推移质不平衡输沙
quantity of bedload transport, mathematical model, reverse problem, nonequilibrium bedload transport.