摘要
贵池发电厂首期工程在试桩中,进行了多项目的综合性试验。通过试桩比选确定首期工程基础采用钢筋混凝土预制桩。从而满足了设计、施工、管理、检测所需要的各种参数,保证了工程地基处理的质量。
During the pile testing of Guichi power plant's first stage engineering, various synthetical tests are engaged in. And the reinforced concrete prefabricate pile is selected to be used as the first stage engineering's foundation, which satisfies various parameters needed in design, construction, management, inspection, and assures the treatment quality of engineering foundation.
出处
《合肥工业大学学报(自然科学版)》
CAS
CSCD
1998年第S1期28-32,共5页
Journal of Hefei University of Technology:Natural Science
关键词
试桩
桩基承载力
静载荷试验
动力测试
pile testing, pile foundation's bearing capacity, static load test, dynamic test