摘要
重点介绍了寺铺尖隧道独头3.6km无轨运输施工通风方案设计和组织实施情况,提出了类似隧道通风应注意的问题。
The design and construction organization of 3. 6km one- way construction ventilation in Sipujian double-track railway tunnel commenced with trackless transportation are mainly introduced. Matters needing attention of this kind tunnelling ventilation are put forward.
出处
《石家庄铁道大学学报(自然科学版)》
1998年第S1期93-97,共5页
Journal of Shijiazhuang Tiedao University(Natural Science Edition)
关键词
隧道
通风
tunnel
ventilation