摘要
本文介绍了永平铜矿2~#污水坝的渗漏现状和渗漏原因,并在此基础上对防渗墙、防渗土工膜和混凝土面板3种治理方案进行了论述,选择了切实可行的治理方案.
This article describes the leakage of No. 2 waste dam in yongping Copper and its reason, reviews three controlling proposals by building leakage-proof wall, making leakage-proof coating and setting concrete board to choose the applicable and practical treatment plan.
关键词
污水坝
渗漏原因
治理方案
Waste dam Leakage reason Controlling proposal