期刊文献+

New process for anaerobic treatment of Vitamin C wastewater in a full scale Plant

New process for anaerobic treatment of Vitamin C wastewater in a full scale plant
下载PDF
导出
摘要 Wastewater reforming was done rationally on technological process and equipment for treating Vitamin C wastewater with full scale UBF. High concentration wastewater was mixed with recycle effluent from anaerobic treatment, so influent COD was reduced and total alkalinity was increased, meanwhile, appropriate hydraulic loading to the reactor was controlled during its running, thus treatment capacity of reactor was improved. Volumetric loading rate was raised from 6 0 kg COD/(m 3·d) to 10 0 kg COD/(m 3·d), biogas production rate was raised from 1 8 m 3/(m 3·d) to 3 2 m 3/(m 3·d), the amount of alkali and dilution water for adjusting pH were also reduced. Wastewater reforming was done rationally on technological process and equipment for treating Vitamin C wastewater with full scale UBF. High concentration wastewater was mixed with recycle effluent from anaerobic treatment, so influent COD was reduced and total alkalinity was increased, meanwhile, appropriate hydraulic loading to the reactor was controlled during its running, thus treatment capacity of reactor was improved. Volumetric loading rate was raised from 6 0 kg COD/(m 3·d) to 10 0 kg COD/(m 3·d), biogas production rate was raised from 1 8 m 3/(m 3·d) to 3 2 m 3/(m 3·d), the amount of alkali and dilution water for adjusting pH were also reduced.
出处 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 1998年第4期35-39,共5页 环境科学学报(英文版)
关键词 Vitamin C wastewater UBF reactor hydraulic load recirculation digestion. Vitamin C wastewater UBF reactor hydraulic load recirculation digestion.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部