An Analysis of Zhabei Cas Turbine Project and the Development of Cas Turbine Generating Unit
-
1Biomass electricity generation exceeded 100 GWh in Shanxian project[J].Electricity,2007,18(2):7-7.
-
2国际[J].建造师,2009(7):17-17.
-
3Periodic Results of "100 Energy Efficiency Standards Project"[J].China Standardization,2013,58(2):2-2.
-
4The Utsira Wind-hydrogen Project——The World's Largest stand-alone wind-hydrogen power system[J].世界石油工业,2007,14(2):9-9.
-
5包绍麟,余申,吕清刚,那永洁,孙运凯,高鸣,高大勇,乔晓辉.波兰Turów电厂考察报告[J].锅炉技术,2007,38(4):25-29.
-
6Gov't to invest 5 bin yuan in a new energy saving technology[J].China's Foreign Trade,2010(3):10-10.
-
7China bio-energy joint venture plants yield 2.6 bin kwh green power[J].China Oil & Gas,2009,16(1):62-62.
-
8阎维平,李春燕,米翠丽,梁秀俊.近临界压力区传热恶化对超临界锅炉水冷壁温度场的影响[J].中国电机工程学报,2009,29(35):48-53. 被引量:7
-
9Successful Commissioning of the Energy Conservation and Emission Reduction Boiler ProJect of Foshan Chengtong Paper[J].造纸信息,2013(8):98-98.
-
10Choung J W Joo K—H Jo J Choi S M Kim C—D Kim H-J 闫红梅(译) 朱炳全(校).柴油机选择性催化还原催化器的最佳布置方法[J].国外内燃机,2011,43(3):44-46.