A Study of Flue Cas Desulfurization Plan for a Power Plant Project
-
1All-round Contracting for Jiangyou andDalate Power Plant Projects[J].Electricity,1999(4):37-40.
-
2Zhou Xiaoyan.A Change of Game Plan[J].Beijing Review,2014,57(19):36-37.
-
3Shenzhen Qianwan Gas Turbine Power Plant Project Will Call for Bid[J].Electricity,2000(2):58-58.
-
4The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation[J].Electricity,2000(3):45-45.
-
5Electron Beam Desulfurization Project of Chengdu Cogeneration Power Plant Started Construction - A new cooperation in environment protection between China and Japan[J].Electricity,1996(2):28-28.
-
6China Electricity Council Zhang Weidong Su Hangtian Liu Jing.Research Reports on the 12^(th) Five-Year Plan for Electric Power Industry Power Grids[J].Electricity,2011,22(3):1-6.
-
7PowerUpAfrica How viable is the ambitious plan to connect Africa’s power grids by 2020?[J].ChinAfrica,2015,7(5):26-27.
-
8Investing agreement on Yunnan Kaiyuan Power Plant Project signed[J].Electricity,2001(1):44-44.
-
9电力科技信息[J].江西电力,2011,35(2):19-19.
-
10蔺勇智.基于FLUENT的变频中央空调室外机散热风道的优化设计[J].中国新技术新产品,2017(5):64-65. 被引量:3