摘要
To transmit electric power from ThreeGorges to East China, ±500 kV HVDC willbe adopted. The first transmission Iine will beconstructed from the Longquan (Yichang)Converter Station to the Zhengping(Changzhou) Inverter Station. This projectconnects the East China Power Network withthe Central China Power Network,coordinates the hydro and thermal electricpower, obtains the profit from timedifference and promotes the process of theinterconnection of the power networks of thewhole country.This paper gives the abstract of thesituation of the preliminary design, primaryresult and development tendency of the firstHVDC transmission project which transmitsthe electric power from Three Gorges to EastChina.
To transmit electric power from ThreeGorges to East China, ±500 kV HVDC willbe adopted. The first transmission Iine will beconstructed from the Longquan (Yichang)Converter Station to the Zhengping(Changzhou) Inverter Station. This projectconnects the East China Power Network withthe Central China Power Network,coordinates the hydro and thermal electricpower, obtains the profit from timedifference and promotes the process of theinterconnection of the power networks of thewhole country.This paper gives the abstract of thesituation of the preliminary design, primaryresult and development tendency of the firstHVDC transmission project which transmitsthe electric power from Three Gorges to EastChina.