8 large coal-fired generating units planned to be commissioned in Shandong Power Grid in 1997
-
1Construction Schedule of Generating Units to be Commissioned in 1998 (as of Dec 11, 1998)[J].Electricity,1999(2):50-50.
-
2The import contract on the generating equipment of Hanfeng Thermal Power Plant signed in Beijing[J].Electricity,1996(4):50-50.
-
3Hanfeng Coal-fired Power Project start to construct[J].Electricity,1997(1):49-49.
-
4Liu Chunsheng.Huaneng Haimen heads the list of energy-based dispatching in Guangdong[J].Electricity,2010,21(1).
-
5Three Gorges’two generating units put into operation[J].Electricity,2004,15(2):53-53.
-
6Construction Schedule of Generating Units Actually Realized in 1996 (as of Aug. 8,1996)[J].Electricity,1996(4):53-53. 被引量:2
-
7Jiaozuo Wanfang to Investment 1 Billion Yuan in Chalco Xinjiang for a Coal-fired Electricity Aluminum Integrated Project[J].China Nonferrous Metals Monthly,2012(5):5-6.
-
8Liu Chunsheng.Datang made great progress in 2009[J].Electricity,2010,21(1).
-
9Tuoketuo Coal-fired Power Project passed World Bank appraisal[J].Electricity,1997(1):41-41.
-
10Wangting gas-fired power project commenced[J].Electricity,2004,15(1):53-53.