摘要
本文介绍一种计算铺轨架桥工期的方法,将一些因素数量化,有一定参考价值。
The paper introduces a method of calculating the time limit for track laying and bridge erecting engineering project, in which several factors are quantized. This method is valuable for reference.
出处
《铁道工程学报》
EI
1997年第1期90-92,共3页
Journal of Railway Engineering Society
关键词
铺轨
架桥
工期计算
track laying
bridge erecting
calculation of time limit for a project