期刊文献+

成都东站扩建工程石灰土基床的现场试验

FIELD MEASUREMENS ON SUBGRADE OF LIMESOIL IN EXTENSION PROJECT OF CHENGDU EAST RAILWAY STATION
下载PDF
导出
摘要 介绍了成都东站扩建工程的概况,成都粘土对工程结构物(路基)的危害,分析了石灰与土的反应机理。在文献〔1〕试验研究的基础上,对成都东站扩建工程石灰土基床进行了系统的现场试验,分析了不同含灰率的石灰土基床在强度等方面的性质变化规律。试验研究资料表明,含灰率为10%的成都粘土石灰土基床优于含灰率为16%的成都粘土石灰土基床。 This paper simply introduces the extension project of Chengdu East Railway Station, the harm of Chengdu clay on constructions (such as subgrade), and the reaction between lime and soil. On the basis of the experimental study of reference(1), systematic field measurements are made upon the subgrade of the limesoil in the extension project of Chengdu East Railway Station, and the resulting regular patterns between lime content and physicalmechanical properties are analyzed . The data indicate that the lime content of ten percent is better than sixteen percent for the subgrade of the limesoil of Chengdu clay.
机构地区 西南交通大学
出处 《铁道工程学报》 EI 1997年第4期93-97,共5页 Journal of Railway Engineering Society
关键词 成都粘土 裂隙粘土(膨胀土) 石灰土 路基基床 Chengdu clay fissured clay (expansive soil) limesoil subgrade
  • 相关文献

参考文献2

二级参考文献4

  • 1朱永林,西南交通大学庆祝建校95周年学术报告会论文集.土木工程类,1991年
  • 2张登良,加固土原理,1990年
  • 3邹天隆,路基工程,1985年,1卷,4期,26页
  • 4廖世文,膨胀土与铁路工程,1984年

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部