摘要
本文论述了在路线工程曲线段“交点”附近设立2~3个能相互通视的控制点对曲线段进行较高精度放样的新方法。
This paper introduces a method of curve setting out in route construction,in which 2 or 3 control points are placed at the intersected point of the curve.
出处
《工程勘察》
CSCD
北大核心
1998年第2期61-64,共4页
Geotechnical Investigation & Surveying