摘要
Several model are built to search optimum mining rate by rising optimum control theory Sor various purpose, A numerical method is extracted to assist both planer and decision maker of mining in their planing or scheduling work.
Several model are built to search optimum mining rate by rising optimum control theory Sor various purpose, A numerical method is extracted to assist both planer and decision maker of mining in their planing or scheduling work.