Based on the calculation and analysis of energy-saving benefit under various operating conditions, and the investment payback period for the low pressure economizer of the 3rd stage project of Longkou Power Plant, the optimum operating conditions of the system and its reasonable heating surface are defined, and the feasibility of the design alternative of the low pressure economizer system is verified.
Based on the calculation and analysis of energy-saving benefit under various operating conditions, and the investment payback period for the low pressure economizer of the 3rd stage project of Longkou Power Plant, the optimum operating conditions of the system and its reasonable heating surface are defined, and the feasibility of the design alternative of the low pressure economizer system is verified.