摘要
Since adopting reform and opening policy. the electric power industry in China developed rapidly. At present there are more than 200 units of 200 MW and above large generation units. Due to hasty development, problems are numerous, especially for the boilers. In the 1986-1990 period (Seventh Five-year Plan period), large capacity boiler outages accounted for 65.8% of all large units equipment outages, and "four tube"