Forced Compressed Air Cooling System for a 300 MW Steam Turbine in Waigaoqiao Power Plant

Forced Compressed Air Cooling System for a 300 MW Steam Turbine in Waigaoqiao Power Plant
下载PDF
导出
摘要 The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storage capacity and good thermal insulation, so the metal temperature of first stage of HP cylinder (FSMTI) may reach 400-450℃ after shut down and it takes 7-8 days to cool to 150℃ by natural cooling, Now with a forced cooling system the cooling time may be reduced to 40 hours, so that the turbine may be opened for repair work in about 5-6 days. The cooling system for #2 unit and test procedure are briefly described below.
出处 《Electricity》 1996年第4期22-24,共3页 电气(英文版)