Second sea-entering approach of Changjiang River: Tongl Canal-planning of control dimensions, analysis of erosion and siltation and selection of outlet

Second sea-entering approach of Changjiang River: TonglCanal-planning of control dimensions, analysis of erosion and siltation and selection of outlet
下载PDF
导出
摘要 Assume that the Tonglu Canal would be widened and deepened in which a water lock is constructed atthe river side, and made open to the sea side. The canal's planned control dimensions are determined, and the erosionand siltation characteristics along the river (totally 81. 8 km) are analyzed by the numerical calculation of one-dimen-sional unsteady flow and the relative standards. According to the data of the evolution, hydrology and sediment inthe Xiaomiaohong Waterway, it is found reasonable to select the channel near the Xingang Gate as the second sea-entering approach. This paper is helpful in planning and designing the approach. Assume that the Tonglu Canal would be widened and deepened in which a water lock is constructed atthe river side, and made open to the sea side. The canal's planned control dimensions are determined, and the erosionand siltation characteristics along the river (totally 81. 8 km) are analyzed by the numerical calculation of one-dimen-sional unsteady flow and the relative standards. According to the data of the evolution, hydrology and sediment inthe Xiaomiaohong Waterway, it is found reasonable to select the channel near the Xingang Gate as the second sea-entering approach. This paper is helpful in planning and designing the approach.
出处 《Acta Oceanologica Sinica》 SCIE CAS CSCD 1995年第1期113-125,共13页 海洋学报(英文版)
关键词 Sea-entering approach Tongl■ Canal erosion and siltation analysis planning scale Sea-entering approach, Tongl■ Canal, erosion and siltation analysis, planning scale
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部