摘要
本文介绍了香港新机场汲水门桥箱形主梁钢结构件的装配和焊接工艺,及用试组装满足检接钢质桥体尺寸精度的方法。
In this paper, the fabrication and welding procedure of Kap Shui Mun bridge main span steel structure for Hongkong new airport project is introduced. Particularly, The applying of trial as-sumbly method for steel structure components which meets the HSFT bolt joint accuracy requirement effectively is discussed in detail.
出处
《中国海洋平台》
1995年第6期22-24,4-5,共5页
China offshore Platform