期刊文献+

天生桥二级水电站主机及辅助设备的技术改进

The Technology Improve About Main Units And Auxiliary Equipment Of Tianshengqiao-Ⅱ Hydropower Station
下载PDF
导出
摘要 天生桥二级水电站主机、辅助设备由于设计、制造、选型、安装等原因,在运行中暴露出大量缺陷,直接威胁机组的安全运行。通过近两年半对设备采取针对性的技改工作,大大提高了主机、辅助设备运行的可靠性、稳定性、灵活性,为天生桥二级水电站创造了较大的经济效益。 The main units and auxiliary equipment of Tianshengqiao-Ⅱ Hydropower Station have exposed some deficiencies since it was put into operation, resulting from design,manufacture, installation. Theimprovement work had been down in past two years, the operation reliabity, stability and flexibility of themain units and ausiliary equipment have increased and certain, benefits are obtained.
作者 鲁银中
出处 《贵州水力发电》 1995年第4期50-53,66,共5页 Guizhou Water Power
关键词 天生桥二级水电站 主机 辅助设备 调压井 供水泵 改进 Tianshengqiao-Ⅱ Hydropower Station main knit auxiliary equipment pump for water supply improve surge shaft
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部