期刊文献+

哈尔滨市区地面沉降问题的分析 被引量:1

Elementary Analysis of Ground Subsidence in Harbin Urban Districts
下载PDF
导出
摘要 哈尔滨市区自70年代末开始大规模开采地下水致使地下水位大幅度下降,水位降落漏斗不断扩展,漏斗中心处的部分建筑物发生不同程度的裂缝和变形,个别路面发生不均匀沉降。本文对哈尔滨市区可能产生的地面沉降问题进行初步分析,并提出有关防治措施的建议。 The wide scope development of ground water has been started since the end of seventies in Harbin f which leads to a sharp decline of ground water table and a continuously expansivecone of depression. For this reason,crackings and deformation of buildings can be found in the central area of this cone and uneven subsidence on road surface was occured. In this paper, elementary analysis of ground subsidence occured in the urban distriCt of Harbin is done and suggestions of preventive measures are put forward.
出处 《黑龙江大学工程学报》 1994年第4期31-34,共4页 Journal of Engineering of Heilongjiang University
关键词 地下水超量开采 水位降落漏斗 裂缝 变形 地面沉降 ground water development cone of depression crackings deformation ground subsidence.
  • 相关文献

同被引文献5

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部