期刊文献+

用分层模糊积分进行中型梯级水电站群开发程序优化 被引量:1

TO SELECT THE OPTIMAL SEQUENCING AND SCHEDULING OF MIDDLE-SIZED SERIAL HYDROPOWER STATIONS BY MULTIPLE-STAGE FUZZY INTEGRATION METHOD
下载PDF
导出
摘要 为了在中型梯级水电站群的开发程序优化决策中全面考虑各种主、客观因素的影响,以获得经济、合理、整体综合指标最优的决策,本文根据模糊积分理论提出了适合该类问题的分层模糊积分综合评判模型。实例验证,获得了满意的结果。 In order to completely consider the affects of various subjective and objective factors in multidimensional decision-making problem such as the optimal sequencing and scheduling of middle-sized serial hydropower stations, So that optimal decision which is conomical, rational and having optimal comprehensive indices is obtained. Based on the theory of fuzzy integration, this paper presents multiplestage fuzzy integration comprehensive evaluation model which is fit for this problem, gives a real example and receives a good result.
机构地区 成都科技大学
出处 《水电能源科学》 北大核心 1989年第3期266-274,共9页 Water Resources and Power
关键词 中型梯级水电站群 分层模糊积分 最优开发程序 Middle-sized serial hydropower stations, Multiple-stage fuzzy integration, Optimal sequencing and scheduling.
  • 相关文献

参考文献2

  • 1张登仕,郑平.嘉陵江中游河段中型水电站梯级规划意见[J]四川水力发电,1987(01).
  • 2许东楚,孔昭真,王华东.环境质量模糊积分评价[J].北京师范大学学报(自然科学版),1986,22(3):66-72. 被引量:2

共引文献1

同被引文献1

  • 1周明德.嘉陵江苍溪至合川段水电开发条件分析[J]水电站设计,1989(02).

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部