摘要
本文应用逐次优化法求解水电站群联合优化调度,并证明了逐级优化法的收敛性。应用这种算法对红水河梯级水电站进行联合优化调度计算,结果是满意的。
In the paper, Progressive optimality algorithm (POA for short) is applied to computate the optimization dispatching for multi-hydroelectricstation system and the convergence of POA is proved, which provides the theoretical basis for the application of POA. The computational results of optimal dispatching for Hongshuihe cascade station is satisfaction.
出处
《水电能源科学》
北大核心
1989年第4期344-353,共10页
Water Resources and Power
关键词
逐次优化法
优化调度
收敛性
梯度法
关联矩阵
progressive optimal algorithm, optimization dispatching convergence, gradient method, related matrix