连云港庙岭开敞式港池的泥沙淤积预报,已于1981年3月提出。该港池于1983年浚深完工。在1983~1985年期间,进行了多次淤积观测,证明淤积预报成果与实际情况相当的一致。这一方法用于其他类似港口的淤积计算,也获得了比较满意的结果。
This paper deals with the siltation problem of an unsheltered basin of Lianyun Harbour. The siltation predication of the basin was made by the authors in 1981, and it was dredged in 1983. During the period of 1983-1985, more than ten times observations of silting intensity in the basin were carried out and it has been shown that the predi cation coincides well with practice. We have also gotten satisfactory results by using the method in some other similar basins.