摘要
本文通过中日双方分别承建的鲁布革水电站十公里长隧洞贯通测量的实例,论述了双方测量技术上的一些不同观点和处理方法,并介绍了最终用中方成果使隧洞高精度贯通的情况。
This paper, through the case study of 10 km tunnel breaking-thrcugh measurement for Lubuge project which was undertaken by Japan and China separately, discuss the different concepts and approaches in this field. It also introduces that the procedure designed by Chinese engineers was finally adopted to ensure high accurate breaking-through measurement for this tunnel.
出处
《工程勘察》
CSCD
北大核心
1989年第6期54-58,共5页
Geotechnical Investigation & Surveying