摘要
根据集体林区实际情况,以建德县罗村乡为例,运用林分转移理论、线性规划的方法,建立了杉木作业级的采伐调整模型,制定了乡、村级森林调整的最优方案和第一分期采伐造林计划。
According to real condition of collective forest zone, the authors set up cut revision model of cunninghamia lanceolata production and drafted the best scheme of forcst investigation of country and village levels and cut plantation plan of the first phase.
出处
《浙江林业科技》
北大核心
1989年第4期3-8,12,共7页
Journal of Zhejiang Forestry Science and Technology