摘要
本文综述了一种确定矿井最优工期的方法、把方法抽象为一个数学模型,揭示了指定工期和最优工期之间的内在联系、并通过四百万吨的常村矿井的实例计算,达到了令人满意的效果。
This paper gives a method to determine optimized time limit for a prolect of coal mine, draws a mathematical model from this Method, reveals the interal relation between appointed time limit and optimized limit.
出处
《河北工程大学学报(自然科学版)》
CAS
1989年第4期57-66,共10页
Journal of Hebei University of Engineering:Natural Science Edition
关键词
工期
效益
time limit for a pro ect, benificial result.