汶川大地震紫坪铺混凝土面板堆石坝震害现象与变形监测分析 被引量:16

EARTHQUAKE DAMAGE PHENOMENA AND DEFORMATION MONITORING ANALYSIS FOR CONCRETE FACED ROCKFILL DAM AT ZIPINGPU PROJECT DURING WENCHUAN EARTHQUAKE
下载PDF
导出
摘要 2008年5月12日四川汶川发生8.0级大地震,震中烈度XI度,造成地面建筑物严重破坏。紫坪铺面板堆石坝坝高156m,距汶川地震震中17km,是地震灾区距地震震中最近、工程规模最大的一个高坝水库工程。紫坪铺大坝受地震影响,产生了一定的变形破坏,引起学术界和工程界广泛关注。依据大坝地震后宏观变形现象和变形监测资料,对大坝堆筑体和混凝土面板的变形破坏现象进行详尽的描述和分析;在此基础上综合分析认为,大坝变形特征以沉降为主,水平位移相对较小,大坝整体处于收缩压密状态,最大沉降发生在大坝顶部,量值为900~1000mm,沉降与坝高之比约为0.6%,大坝坝体和下游坝坡没有产生显著破坏,大坝结构功能受地震影响较小。 Earthquake occurred on May 12, 2008 in Wenchuan, Sichuan Province, with magnitude of 8.0 and epicenter intensity of XI, causing serious damage to the structures on ground. The dam height of Zipingpu concrete faced rockfill dam(CFRD) is 156 m and it is 17 km from Wenchuan earthquake epicenter, which is the largest high dam reservoir project and the nearest from earthquake epicenter in the earthquake area. Deformations and damages occurred due to the earthquake, attracting attentions from both academic and engineering fields. Detailed description and analysis are presented for damage due to deformations of dam embankment and concrete slabs based on macroscopic deformation phenomena after earthquake and deformation monitoring data. The comprehensive analysis results indicate that dam deformations are mainly settlement, and horizontal displacement is relatively small. Dam body is in the conditions of contraction and compaction. The maximum settlement occurs at dam crest, valuing 900 - 1 000 mm; and the ratio of the settlement to dam height is around 0.6%. No evident damages occurs in dam body and downstream slope; and structural function of dam is not seriously affected by the earthquake.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2009年第4期840-849,共10页 Chinese Journal of Rock Mechanics and Engineering
关键词 水利工程 混凝土面板堆石坝 震害现象 变形监测 沉降 影响因素 汶川大地震 hydraulic engineering concrete faced rockfill dam earthquake damage phenomena deformationmonitoring settlement affecting factor Wenchuanearthquake
  • 相关文献

参考文献5

二级参考文献18

  • 1COOKE J B. Progress in roekfill dams[J]. Journal of Geotechnical Engineering, ASCE, 1984: 110(10): 1383-1414.
  • 2PUJOL A. Argentina's dam construction program[J]. International Journal of Hydropower and Dams, 1999, 6(2): 26 - 27.
  • 3ASTETE J, SAN MARTIN L, ALVOREZ L. The santa juana cfrd for irrigation in northern chile[J]. International Water Power and Dam Construction, 1992: 44(4): 42 - 44.
  • 4NOGUERA G, BELLET A, VIDAL L. Design and construction of Chile's Puclaro dam[J]. International Water Power and Dam Construction, 1999, 59(9): 16 - 19.
  • 5KENNEALLY D, FULLER M, HE Q. The West Seti CFRD planned for western Nepal[J] International Journal of Hydropower and Dams, 2001, 8(5): 75 - 77.
  • 6COOKE J B, SHERARD J L. Design, construction of the and performance[C]// Proceedings of the 2nd Symposium on Concrete Face Rockfill Dams. Detroit, 1985:1 - 658.
  • 7HUNTER G J, FELL R. Rockfill modulus and settlement of concrete face roekfill dam[J]. Journal of Geotechnical and Geoenvironmental Engineering, ASCE, 2003, 129(10): 909 - 917.
  • 8CLEMENTS R P, Post -construction deformation of rockfill dams[J]. Journal of Geotechnical Engineering, ASCE, 1984, 110(7): 821 - 840.
  • 9SHERARD J L, COOKE J B. Concrete face rockfill dam: Ⅰ. Assessment[J]. Journal of Geotechnical Engineering, 1987, 113: 1096- 1112.
  • 10WON Myoung-Soo, YOU-SEONG Kim. A case study on the post-construction deformation of concrete face rockfill dams[J]. Can Geotech J, 2008, 45:845 - 852.

共引文献136

同被引文献187

引证文献16

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部