摘要
针对我国建设项目后评价的理论研究滞后于后评价实践,提出应就后评价指标体系、后评价方法、后评价内容、后评价管理体系进行研究的思考。
Consider that the theoretical investigation of post evaluation on eonstruction project lag behind the practice of post evaluation in China, put forward that we should do some research on system indices of post evaluation, technique of post evaluation, content of post evaluation and the management system of pest evaluation.
出处
《基建优化》
2007年第2期11-14,共4页
Optimization of Capital Construction
关键词
建设项目
后评价
全生命期
评价指标
construction project
post evaluation
life cycle
index of evaluation