摘要
针对建筑热水系统中无效热水的产生,给出新建工程需要注意的设计技术措施(合理分区、循环方式、同程布置);对无循环热水系统的工程改造进行了技术与经济效益的分析;提出合理选择与安装热水系统的设备、器材方案,并给出了施工中最容易出现的问题及其解决方法。
In this paper, construction the invalid hot water in heating system, the technical measures of design were given to new works that need attention (Reasonable division, circulation, layout with the distance); The technical, economic and benefits were Analyses of those projects without hot water cycle system; A reasonable way about choice and installation of the hot water system equipment, tools Was formed. Then presented the most vulnerable to the problems and their solutions were given.
出处
《工程建设与设计》
2009年第3期75-78,共4页
Construction & Design for Engineering
关键词
建筑热水系统
无效热水
技术措施
building hot water system
invalid hot water
technical measures