摘要
阐述了湖州垃圾焚烧发电工程主厂房的结构方案选择、计算软件应用、垃圾储存池设计、混凝土结构超长无缝施工技术、地基基础设计等问题,论述了垃圾焚烧发电厂主厂房结构的特点及设计要点。
Design of Huzhou power project by incinerating refuse, such as the selection of structural scheme for the main plant, use of the structure calculation software, design of refuse bunker, non-joint construction technique as to the over-length concrete structure, subsoil treatment and foundation design, is introduced and expounded. The features and essentials of structural design in the main plant are discussed by illustrating its specific engineer design.
出处
《建筑结构》
CSCD
北大核心
2009年第3期69-71,共3页
Building Structure
关键词
垃圾焚烧发电厂
垃圾储存池
超长无缝施工技术
SATWE
power plant by incinerating refuse
refuse bunker
over-length and non-joint construction technique
SATWE