20m大跨预应力空心板先张法施工技术 被引量:1

Pre-tensioned Construction Technology of Large-span Prestressed Hollow Slab with 20m Span
下载PDF
导出
摘要 邢威高速公路在K31+300~K51+150的主线跨线桥上部结构为20m跨大型预应力空心板。介绍预应力空心板先张法、集中预制施工工艺。研究预应力钢筋张拉采用的单张整放方式以及砂箱四次放张工艺。同时阐述空心板外模采用大块钢模、内模采用抽拉式钢模及胶囊芯模、采用人字桅杆配合卷扬机架设的安装方法。实践证明,该方法施工机械简单、施工速度快、经济效果明显。 Large-span prestressed hollow slab is adopted in the upper part of main flyover with K31 + 300 - K51 + 150 in Xingtai-Weihai Highway. The pre-tensioned method and centralized pre-fabrieation in the factory are introduced in this paper. Besides, one end of tension with whole putting and four-time tension of the flask are studied. The technologies of hollow slabs are outlined such as large outer steel fonnwork, extraetion-tension inner steel formwork and inner capsule-core formwork, installation of hoist with biped mast. The results show that its method is available with simple machine, fast construction and good economic benefit.
出处 《施工技术》 CAS 北大核心 2009年第3期109-111,共3页 Construction Technology
基金 国家自然科学基金项目(50774092) 全国优秀博士学位论文专项资金资助(200449)
关键词 预应力 空心板 先张法 施工技术 pretress hollow slab pre-tension method construction technology
  • 相关文献

参考文献4

二级参考文献10

共引文献13

同被引文献8

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部