TWO-STAGE PRODUCTION SCHEDULING WITH AN OPTION OF OUTSOURCING FROM A REMOTE SUPPLIER 被引量:15

TWO-STAGE PRODUCTION SCHEDULING WITH AN OPTION OF OUTSOURCING FROM A REMOTE SUPPLIER
原文传递
导出
摘要 This paper studies a two-stage production system with n job orders where each job needs two sequential operations. In addition to the two in-house production facilities, the manufacturer has another option of outsourcing some stage-one operations to a remote outside supplier. The jobs with their stage-one operations outsourced are subject to a batch transportation delay from the outside supplier before their respective stage-two operations can be started in-house. The problem is to design an integrated schedule that considers both the in-house production and the outsourcing with the aim of optimally balancing the outsourcing cost and the makespan. The problem is NP-hard. We have developed an optimal algorithm and a heuristic algorithm to solve the problem, and conducted computational experiments to validate our model and algorithms. Our modeling and algorithm framework can be extended to handle other more general cases such as when the outside supplier has a production facility with a different processing efficiency and when there are many outside suppliers on a spot market. This paper studies a two-stage production system with n job orders where each job needs two sequential operations. In addition to the two in-house production facilities, the manufacturer has another option of outsourcing some stage-one operations to a remote outside supplier. The jobs with their stage-one operations outsourced are subject to a batch transportation delay from the outside supplier before their respective stage-two operations can be started in-house. The problem is to design an integrated schedule that considers both the in-house production and the outsourcing with the aim of optimally balancing the outsourcing cost and the makespan. The problem is NP-hard. We have developed an optimal algorithm and a heuristic algorithm to solve the problem, and conducted computational experiments to validate our model and algorithms. Our modeling and algorithm framework can be extended to handle other more general cases such as when the outside supplier has a production facility with a different processing efficiency and when there are many outside suppliers on a spot market.
作者 Xiangtong QI
出处 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2009年第1期1-15,共15页 系统科学与系统工程学报(英文版)
基金 supported in part by the Hong Kong RGC CERG under grant No.618606.
关键词 OUTSOURCING SCHEDULING algorithms Outsourcing, scheduling, algorithms
  • 相关文献

参考文献14

  • 1Chung-Yee Lee,Joseph Y-T. Leung,Gang Yu.Two Machine Scheduling under Disruptions with Transportation Considerations[J].Journal of Scheduling.2006(1)
  • 2Ceyda O?uz,M. Fikret Ercan.A Genetic Algorithm for Hybrid Flow-shop Scheduling with Multiprocessor Tasks[J].Journal of Scheduling.2005(4)
  • 3Nicholas G. Hall,Chris N. Potts.The Coordination of Scheduling and Batch Deliveries[J].Annals of Operations Research.2005(1)
  • 4T.C. Edwin Cheng,Mikhail Y. Kovalyov.Single Supplier Scheduling for Multiple Deliveries[J].Annals of Operations Research (-).2001(1-4)
  • 5Vairaktarakis,G.L.Noncooperative outsourcing games[]..2006
  • 6Vairaktarakis,G.L.Cooperative strategies for manufacturing planning with negotiable third-party capacity[]..2006
  • 7Aydinliyim,T,Vairaktarakis,G.L.Coordination of outsourcing operations[]..2006
  • 8Chen,Z.L,Li,C.L.Scheduling with subcontracting options[].IIE Transactions.2008
  • 9Kyparisis,G.J,Koulamas,C.A note on makespan minimization in two-stage flexible flow shops with uniform machines[].European Journal of Operational Research.2006
  • 10Lee,I.S,Sung,C.S.Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed[].European Journal of Operational Research.2008

同被引文献52

  • 1Xiangtong Qi.Production scheduling with subcontracting: the subcontractor’s pricing game[J].Journal of Scheduling.2012(6)
  • 2Byung-Cheon Choi,Jibok Chung.Two-machine flow shop scheduling problem with an outsourcing option[J].European Journal of Operational Research.2011(1)
  • 3Kangbok Lee,Byung-Cheon Choi.Two-stage production scheduling with an outsourcing option[J].European Journal of Operational Research.2011(3)
  • 4Xiangtong Qi.Outsourcing and production scheduling for a two-stage flow shop[J].International Journal of Production Economics.2010(1)
  • 5Ik Sun Lee,C.S. Sung.Single machine scheduling with outsourcing allowed[J].International Journal of Production Economics.2007(2)
  • 6Ik Sun Lee,C.S. Sung.Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed[J].European Journal of Operational Research.2007(3)
  • 7Daeyoung Chung,Kichang Lee,Kitae Shin,Jinwoo Park.A new approach to job shop scheduling problems with due date constraints considering operation subcontracts[J].International Journal of Production Economics.2005(2)
  • 8Xiaoqiang Cai,Chung-Yee Lee,George L. Vairaktarakis.Optimization of processing and delivery decisions involving third-party machines[J].Nonlinear Analysis.2005(5)
  • 9Young Hae Lee,Chan Seok Jeong,Chiung Moon.Advanced planning and scheduling with outsourcing in manufacturing supply chain[J].Computers & Industrial Engineering.2002(1)
  • 10CHUNG D, LEE K, SHIN K, et al. A new approach to job shop scheduling problems with due date constraints considering operation subcontracts[J]. International Journal of Production Economics 2005, 98(2): 238-250.

引证文献15

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部