摘要
通过大倾角综采工作面开采,分析支架和运输机下滑及支架失稳对工作面开采的影响以及解决支架的措施。
Analysis of large angle bracket mining, transport planes down so that the causes of stent failure and when the impact of mining, as well as the settlement of stents and stent instability transport planes drop the measures taken.
出处
《煤炭技术》
CAS
北大核心
2009年第4期192-192,共1页
Coal Technology
关键词
大倾角
综采工作面
下滑
big dip fully mechanized coal mining face stent plane down