摘要
结合在垦东12区块进海路及海油陆采平台工程的质量检验,阐述了滩海陆岸设施建造施工检验阶段各质量要点。指出,滩海陆岸设施主体工程的质量控制归根到底是原材料和施工工序的质量控制。
Combined with the quality detection of the entrance to the sea and the platform for oil production, the explanation focuses on the quality points at different test stages of facility construction at beach strand. It is pointed out that quality control over the main projects of facilities at beach strand lies in the quality control over the raw materials and the working sequences of construction.
出处
《石油工业技术监督》
2009年第4期37-39,共3页
Technology Supervision in Petroleum Industry
关键词
稳定计算
混凝土
质量控制
板桩抛石防护
滩海
陆岸
stable calculation
concrete
quality control
plate pole
protection by throwing stones
beach strand