期刊文献+

包含产品回收的供需双方联合生产库存模型

Integrated Production-Inventory Model Including Product-Recycled
下载PDF
导出
摘要 研究了包含产品回收的单制造商-单销售商供应链生产库存联合优化问题,回收物流系统中既包含一般制造的新产品,也包含回收再制造的产品,将销售商每次的订购量、制造商的每个生产周期中销售商的订货次数及制造商的最优生产循环周期作为决策变量,对制造商和销售商的库存总成本进行联合优化,并设计了优化算法。 A single vendor and single buyer's integrated production-inventory problem including product-recycled is studied.The recycle logistics system covers both new producing and remanufacturing with quantity as well as the times of ordering and the optimal cycling period as decision-making variables.An optimal algorithm is designed to optimize the integrated inventory cost.
出处 《青岛大学学报(自然科学版)》 CAS 2009年第1期82-86,共5页 Journal of Qingdao University(Natural Science Edition)
关键词 产品回收 再制造 联合生产库存 product-recycle remanufacturing lntegrated production-lnventory
  • 相关文献

参考文献12

  • 1Schrady D. A deterministic inventory model for reparable items [J]. Naval Research Logistics,1967 (14) : 391 - 398.
  • 2Richter K. The EOQ repair and waste disposal model with variable setup numbers [J]. European Journal of Operational Research,1996,95(2) : 313 - 324.
  • 3Richter K. The extended EOQ repair and waster disposal model [J]. International Journal Production Economics,1996: 45(1-3) :413 - 448.
  • 4Teunter R H. Inventory control in hybrid systems with remanufacturing [J]. Management Science, 1999, 45 (5): 733 - 747.
  • 5Teunter R H. Economic ordering quantities of recovery item inventory systems [J]. Naval Research Logistics, 2001, 48(6): 484 - 495.
  • 6Teunter R H. Lot-sizing for inventory systems with product recovery [J]. Computers Industrial Engineering, 2004, 46(3): 431 - 441
  • 7李新军,达庆利.一种新型的再制造条件下EOQ模型[J].东南大学学报(自然科学版),2006,36(4):667-671. 被引量:14
  • 8杨瑾,赵嵩正,王娟茹.基于供需一体化协同控制的供应链库存模型[J].工业工程与管理,2005,10(2):34-38. 被引量:9
  • 9邵晓峰,黄培清,季建华.供应链中供需双方合作批量模型的研究[J].管理工程学报,2001,15(2):54-57. 被引量:67
  • 10柳键,马士华.供应链库存协调与优化模型研究[J].管理科学学报,2004,7(4):1-8. 被引量:56

二级参考文献48

  • 1Lee H, Padamanabhan P, Whang S. The bullwhip effect in supply chain[J]. Sloan Management Review, 1997, 38(3) : 93 -102.
  • 2DEKKER R, et al. A spare parts stocking policy based on equipment criticality [ J ]. International Journal of Production Economics, 1998, (56 -57) : 69 -77.
  • 3Pan C-H J, Yang J S. A study of an integrated inventory with controllable lead time [ J ]. International Journal of Production Research,2002, 40 (5) : 1263 - 1273.
  • 4Huang C K. An integrated vendor-buyer cooperative inventory model for items with imperfect quality [ J ]. Production Planning & Control, 2002, 13 (4) : 355 -361.
  • 5Ouyang L Y, Chen C K, Chang H C. Lead time and ordering cost reductions in continuous review inventory systems with partial backorders[J]. Journal of the Operational Research Society, 1999,50(12) : 1272 -1279.
  • 6Hadley G, Whitin T M. Analysis of inventory systems [ M ].Englewood Cliffs, NJ: Prentice Hall, 1963.
  • 7Goyal S K. A joint economic-lot-size model for purchaser and vendor: A comment[ J]. Decision Sciences, 1988, 19 : 236 -241.
  • 8Lee H L, Billington C. Supply chain management: Pitfalls and opportunities[J]. Sloan Management Review, 1992, 33: 65-73.
  • 9Lee H L, Billington C. The evolution of supply chain management models and practice at Hewlett Packard[J]. Interfaces, 1995, 25(5): 42-63.
  • 10Parlar M, Berkin D. Future supply uncertainty in EOQ models[J]. Naval Research Logistics, 1991, 38: 107-121.

共引文献141

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部