浅谈预应力混凝土箱梁冬季施工的几点措施 被引量:1

On several measures for winter construction of prestressed concrete box-girder
下载PDF
导出
摘要 结合鞍山市省道沈营线千山西路跨线桥施工工程实例,通过冬季预应力混凝土箱梁的施工、蒸汽养护等施工技术,对做好冬季施工的措施提出一些见解,从而保证工程按期完工和预制混凝土箱梁的质量。 Combined with construction work of Qianshan west road overpass bridge in Shenyang-Yingkou line of provincial road in Anshan, the construction technology of prestressed concrete box-girder in winter as well as steam curing measures are introduced. Some suggestions are proposed for winter construction of concrete, which ensure on-time completion of works and the quality of prestressed concrete box-girder.
出处 《山西建筑》 2009年第13期140-141,共2页 Shanxi Architecture
关键词 混凝土箱梁 冬季 施工 养护 concrete box-girder, winter, construction, curing