摘要
结合共产主义渠大桥的工程概况,提出了组合箱梁预制施工方案,详细介绍了共产主义渠大桥组合箱梁预制施工工艺,以使预制箱梁的施工质量达到预定目标,从而确保大桥顺利完工。
The paper joins together engineering general situation of Communism trench big Bridge, puts forward the combination beam prepared construction scheme, detailed introduces the big bridge beam prepared construction craft, making the construction quality attained prearranged target, insuring smoothly completion of big bridge.
出处
《山西建筑》
2009年第13期303-304,共2页
Shanxi Architecture
关键词
大桥
组合箱梁
施工工艺
质量控制
big bridge, combination beam, construction craft, quality master