期刊文献+

300MW机组脱硫系统运行中出现的问题及其处理方法 被引量:5

The problems and treatment methods of desulphurization system operation in the 300MW unit
下载PDF
导出
摘要 对哈尔滨热电有限责任公司300MW机组脱硫系统运行中出现的烟气-烟气再热器(GGH)压差大、石膏脱水困难、脱硫效率不稳定问题进行了分析,提出了解决方案和处理方法,以保证脱硫系统正常运行。 In this article the problems, which include larger pressure drop of gas - gas heater ( GGH ) , difficulty for gypsum dewatering, unsteady efficiency of desulphurization, occurred in the 300 MW unit desulphurization system operation of Harbin Thermoelectric Corporation Limited were analyzed, the solving plan and treatment methods were proposed to guarantee the desulphurization system operating normally.
出处 《华电技术》 CAS 2009年第4期75-77,共3页 HUADIAN TECHNOLOGY
关键词 脱硫系统 烟气-烟气换热器(GGH) 脱硫效率 处理方法 desulphurization system gas - gas heater ( GGH ) efficiency of desulphurization treatment method
  • 相关文献

同被引文献21

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部