摘要
通过对模板的安装、测量、质量的长期监控,就模板安装工艺进行了详细论述,对预制梁的成品作了测量检验,与规范比较,分析出模板的安装尺寸,随时作出施工调整,以便保证施工质量和施工进度。
This article makes a detailed statement about installation technique after a long peroid supervision on instaUlation, measurement, and quality of the complate. It also measures the finished prefabricate girder, and analyzes installing size of the complate after comparing with the "criterion so as to regulate the construction and thus ensure the quality and progress of construction.
出处
《山西建筑》
2009年第14期141-142,共2页
Shanxi Architecture
关键词
预制箱梁
模板安装
检查
安装工艺
prefabracate girder, installation of complate, inspection, installing technique